  Inaugural Function held on Wednesday 2nd December 2009 by the hand of ...
  More ...
Bhumi Pujan
  Bhoomipujan Programme held on 27th May 2008 by the hand of ...
  More ...
Ajit Dada Pawar
  Water Resources Minister visit at Gangakhed Sugar & Energy Pvt. Ltd. on 11 April 2009. ...
  More ...


 

Project Execution Methodology

The project would be implemented on Package basis for Sugar, Co-Gen & Ethanol using the Best Available System and Technology (BAST) with an objective to optimise cost & energy conservation.

This method of Project execution helps in reducing the project cost and would provide fixed price & time frame for implementation.

The scope of Technical Consultant covers preparation of DPR, Package Contract specifications, bid evaluation, vetting of basic design and engineering submitted by selected package contractors, Project Management and coordination with the package contractors.

The ICPP would be the first of its kind in Indian Sugar Industry with the following select unique features.

  • Boiler and turbine with 110 Kg per sq cm pressure and temp.535 C for optimising generation from renewable energy.

  • Adoption of diffusers instead of conventional milling system for maximum sugar recovery and reduction in moisture in bagasse.

  • Adoption of energy optimising devices to maximise surplus energy from bagasse.

  • Use of independent incinerator system instead of composting for continuous running of distillery beyond 270 days.

  • Use of multi-functional micro processor based monitoring and control system for all the processes to achieve reliability and optimisation.

  • Adoption of advanced methods of cane development in the region to ensure extension of crushing season beyond the present average of 160 days without any loss in sugar recovery.

  • Development of Village wise centres for encouragement to farmers and collection of Bio mass for power generation during non crushing season
   